GT 330 AOil-Gas Fired Hot Water boiler English11/20/09Installation and operating instructionsWarning:Before putting the boiler into operation
5.2 Boiler Venting – Category III & IV Vent Systems Typical Layouts and Requirements. Caution & Warning: Improperly sealed venting system
5.3 Boiler Venting – Side-Wall or Direct Vent Systems Typical Layouts and Requirements. Caution & Warning: Improperly sealed venting system cou
5.4 Boiler Venting – Side-wall or Direct Vent Systems Sizing Tables & Vent Safety Device • All venting lengths must be calculated to equivale
A VENT SHALL NOT TERMINATE…..Directly above a paved sidewalk or driveway which serves 2 buildings.Less than 7 ft. any paved sidewalk or drive wayLess
6 Dimensional information required for connection of the boilerA : chimney connection : GT 304 A/II to GT 306 A/II : 7" øGT 307 A/II to GT 309 A/
Electrical1 WiringWiring in accordance with the requ irements of the authority havingjurisdiction or, in the absence of such requ irements, with the
FOR YOUR SAFETY READ BEFORE OPERATINGWARNING: If you do not follow these instructions exactly,a fire or explosion may result causing properly damage,
Maintenance1 BoilerIt is no t ad visable to drain an in stallation, ex cept in ca se ofabsolute necessity. Check the water level of the installation
12348553N136- open the sweeping door (upper door) by unscrewing the 4 lock nuts.- remove the convection baffles,- using the brush supplied, carefully
Service and maintenance schedule`Require annul system inspecti on of the heating boiler, burnerand controls by qualified service personnel,`Heating sy
Guideline of NoticesWarning:indicates presence of hazards that can cause, if notavoided, severe personal injury, death or substantialproperty damage.
The Manufacturer: Bp 30 – 57, RUE DE LA Gare F – 67580 MERTZWILLER Tel: +33/3/88/80/27/00 – Fax: +33/3 88 80 27 99 Ni
ContentsContents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Regulations and guidelinesThe installation and operating instructions shown here are given as aguide for installation and operation and are not meant
Unit GT 334A GT 335A GT 336A GT 337A GT 338A GT 339AMBH 404 598 808 1,024 1,226 1,442kW 118 175 237 300 359 423US GPH 2.80 4.15 5.60 7.10 8.50 10.00MB
4 Main DimensionsGT 330 AA Water flow tapping 2 1/2" NPSCB Water return 2 1/2" NPSCC Drain 1 1/2" FPTD Rp 2 1/2 diameter sludge removal
Boiler Installation1InstallationThe GT 300 A/II boiler has a bas e frame, although a housekeepingpad is re commended to keep steel par ts out of casua
5. Boiler Venting & Chimney General Caution & Warning: It is advised and recommended that the heating contractor-professional apply vent m
5.1 Boiler Venting – Category I & II Typical Layouts and Requirements. Caution & Warning: Improperly sealed venting system could result in
Kommentare zu diesen Handbüchern